- Both large and small quantity generators are required to do weekly inspections
- See 40 CFR 262.16(b)(2)(iv) for SQG 40 CFR 262.17(a)(1)(v) for a Large Quantity Generator (LQG)
- Hazardous waste inspection guidance information on back
- Up to 5 weeks of inspections per sheet
- English
- 8-1/2" x 11"
- 25 per pad
- Made in the USA
Size: 8.5" x 11"
Format: Pad
Compliance Topic: Jobsite Safety
Language: English
Sold As: 25 Per Pad